Reference workflows
Start from a trusted engineering flow
Templates define the topology, allowed tools, artifact contracts, and bounded loop. You still review and approve every compiled plan.
Ready
Folded-cascode OTA verification
Initial sizing, deterministic synthetic simulation, specification grading, a bounded correction loop, and an evidence-linked run summary.
7 stagesMax 3 iterationsLocal stdio MCPSynthetic fixture
Use this workflowWhat the run demonstrates
Grade every target
See measured values, targets, and normalized margins.
Improve deterministically
Failed gain or GBW produces a bounded sizing proposal.
Preserve the approval boundary
No engineering tool runs before plan approval.
Replay from evidence
Reproduce decisions without invoking tools or the model.